Celestine
Celestine
Celestine is a dodecahedron star that is a tree topper or stuffed toy.
One size
Size
Approximately 10” across from point to point
Materials
2 Hank Berroco Ultra Alpaca Light (50 grs), #4201 Winter White
1 Set (4) double pointed knitting needles, size 2 (2.50 mm) OR SIZE TO OBTAIN GAUGE
5 St markers (1 a different color)
Tapestry needle
1 Bag Polyester stuffing
Gauge
28 sts = 4”; 40 rows = 4” in St st
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTE
Star consists of 12 points. Each point is made separately, but are joined tog as you work.
Star
1st Point: With dpn’s, cast on 55 sts. Divide sts with 22 sts on each of the first 2 needles and 11 sts on the last needle. Join, being careful not to twist sts. Mark for beg of rnd with different colored marker and carry marker up.
Rnd 1: * K11, place marker, rep from * 3 times more, k11. Knit 3 rnds.
Dec Rnd: * K2 tog, k to 2 sts before marker, SSK, rep from * 4 times more – 45 sts. Knit 4 rnds. Rep the last 5 rnds 3 times more – 15 sts.
Next Rnd: * Sl 2, k1, pass 2 slipped sts over k1, rep from * 4 times more – 5 sts. Break off yarn leaving a 10” long end. Thread end into tapestry needle and draw through all sts on needle. Pull up tightly and secure. Fasten off.
2nd Point: With dpn’s, cast on 44 sts, pick up and k11 sts along one side of 1st Point – 55 sts. Complete same as 1st Point.
3rd Point: With dpn’s, cast on 33 sts, pick up and k11 sts along left side of 2nd Point, then 11 sts along next side of 1st Point – 55 sts. Complete same as 1st Point.
4th and 5th Points: Work same as 3rd Point, turning 1st Point each time so that you are picking up sts along the left side of the point you just made and the next side of 1st Point.
6th Point: With dpn’s, cast on 22 sts, pick up and k11 sts along left side of 5th Point, 11 sts along final side of 1st Point, then 11 sts along right side of 5th Point – 55 sts. Complete same as 1st Point. You should now have one central point (1st Point) with 5 points surrounding it. In this manner, make another round of 5 points. For the 1st of these points you will cast on 33 sts, then pick up and k11 sts along the sides of 2 points of the previous rnd. For the next 3 points you will cast on 22 sts, pick up and k11 sts along the left side of the point you just made, then pick up and k11 sts along the sides of the next 2 points of the previous rnd. For the last point of this rnd you will cast on 11 sts, pick up and k11 sts along the side of the point you just made, pick up and k11 sts along the sides of the last 2 points of the previous rnd, then pick up and k11 sts along the first point of this rnd. You should now have the star completed except for the last point. Stuff star firmly with Polyester stuffing.
Last Point: Pick up and k11 sts along the side of each point of the previous rnd – 55 sts. Work same as 1st Point up to Next Rnd – 18 sts. Stuff this point firmly. Complete same as 1st Point, stuffing the end before you pull up the final 5 sts and fasten off.
- Yarns Used:Berroco Ultra® Alpaca Light
- Designer:Norah Gaughan
- Skill Level:Intermediate
- Craft:Knit
- Project Type:Holiday