Dublin
Dublin
What's a bear to wear to Ireland? An Aran jumper, of course!
One size
Finished Measurements
Chest – 11”
Length – 7½”
Materials
1 Ball BLACKSTONE TWEED (50 grs), #2601 Clover Honey
1 Set (4) double pointed knitting needles, size 7 (4.50 mm) OR SIZE TO OBTAIN GAUGE
Cable needle (cn)
Crochet hook, size 4.50 mm (G)
1 St marker
One ½” button
Gauge
18 sts = 4”; 2nds = 4” in Reverse St st
TO SAVE TIME, TAKE TIME TO CHECK GAUGE
NOTE
This garment is worked in the round to the underarms, then divided for back and front.
Stitch Glossary
MB (Make bobble)
(Yo, k1) 3 times in next st (6 sts made from 1), turn; p6, turn; k6, turn; (p2 tog) 3 times (3 sts left), turn; sl 1, k2 tog, psso – 1 st remains.
CF4
Sl 2 sts to cn and hold in FRONT, k2, k2 from cn
CB4
Sl 2 sts to cn and hold in BACK, k2, k2 from cn
RT3
Sl 1 st to cn and hold in BACK, k2, p1 from cn
LT3
Sl 2 sts to cn and hold in FRONT, p1, k2 from cn
Diamond Pattern (Worked over 16 sts)
Rnd 1: P6, CB4, p6.
Rnd 2 and all even numbered rnds: K the k sts and p the p sts as they face you.
Rnd 3: P5, RT3, LT3, p5.
Rnd 5: P4, RT3, p2, LT3, p4.
Rnd 7: P3, RT3, p4, LT3, p3.
Rnd 9: P3, LT3, p4, RT3, p3.
Rnd 11: P4, LT3, p2, RT3, p4.
Rnd 13: P5, LT3, RT3, p5.
Rnd 15: P6, CB4, p6.
Rnd 16: Rep Rnd 2.
These 16 rnds form Diamond Pat.
Note: When you start working Cable Pats 1 and 2 back and forth in rows, you need to purl Rows 2 and 4.
Cable Pattern 1 (Worked over 4 sts)
Rnd 1: CF4
Rnds 2, 3 and 4: Knit 4
Rep these 4 rnds for Cable Pat 1.
CABLE PATTERN 2 (Worked over 4 sts)
Rnd 1: CB4
Rnds 2, 3 and 4: Knit 4
Rep these 4 rnds for Cable Pat 2.
Dress
With dpn’s, cast on 64 sts. Divide sts onto 3 needles and join, being careful not to twist sts. Mark for beg of rnd and carry marker up. Work in k2, p2 ribbing for 3 rnds, then knit 2 rnds.
Bobble Rnd: K2, MB, (k4, MB) 12 times, k1 – 13 bobbles made. Knit 3 rnds.
Establish Cable Pats: Rnd 1: P4, work Rnd 1 of Cable Pat 1 over 4 sts, work Rnd 1 of Diamond Pat over 16 sts, work Rnd 1 of Cable Pat 2 over 4 sts, p8, work Rnd 1 of Cable Pat 1 over 4 sts, p16, work Rnd 1 of Cable Pat 2 over 4 sts, p4.
Rnd 2: P4, work Rnd 2 of Cable Pat 1 over 4 sts, work Rnd 2 of Diamond Pat over 16 sts, work Rnd 2 of Cable Pat 2 over 4 sts, p8, work Rnd 2 of Cable Pat 1 over 4 sts, p16, work Rnd 2 of Cable Pat 2 over 4 sts, p4. Work even in pats as established until 16 rnds of Diamond Pat have been completed. Break off yarn. You will be working back and forth from here, still using dpn’s, but work will not be joined.
Divide for Front Neck: Row 1 (RS): Sl 16 sts to first dpn without working them; join yarn and k2, p2 tog, p4, work Row 1 of Cable Pat 2 over 4 sts, p2, (p2 tog) twice, p2, work Row 1 of Cable Pat 1 over 4 sts, p16, work Row 1 of Cable Pat 2 over 4 sts, p2, (p2 tog) twice, p2, work Row 1 of Cable Pat 1 over 4 sts, p4, p2 tog, k2 – 58 sts. Turn. (See note before Cable Pats).
Row 2: P2, k5, work Row 2 of Cable Pat 1 over 4 sts, k6, work Row 2 of Cable Pat 2 over 4 sts, k16, work Row 2 of Cable Pat 1 over 4 sts, k6, work Row 2 of Cable Pat 2 over 4 sts, k5, p2.
Row 3: LT3, p4, work Row 3 of Cable Pat 2 over 4 sts, p6, work Row 3 of Cable Pat 1 over 4 sts, p16, work Row 3 of Cable Pat 2 over 4 sts, p6, work Row 3 of Cable Pat 1 over 4 sts, p4, RT3.
Row 4: K1, p2, k4, work Row 4 of Cable Pat 1 over 4 sts, k6, work Row 4 of Cable Pat 2 over 4 sts, k16, work Row 4 of Cable Pat 1 over 4 sts, k6, work Row 4 of Cable Pat 2 over 4 sts, k4, p2, k1.
Row 5: P1, LT3, p3, work Row 1 of Cable Pat 2 over 4 sts, p1, (p2 tog) twice, p1, work Row 1 of Cable Pat 1 over 4 sts, p16, work Row 1 of Cable Pat 2 over 4 sts, p1, (p2 tog) twice, p1, work Row 1 of Cable Pat 2 over 4 sts, p3, RT3, p1 – 54 sts. Mark beg of last row for buttonloop.
Row 6: K2, p2, k3, work Row 2 of Cable Pat 1 over 4 sts, k4, work Row 2 of Cable Pat 2 over 4 sts, k16, work Row 2 of Cable Pat 1 over 4 sts, k4, work Row 2 of Cable Pat 2 over 4 sts, k3, p2, k2.
Row 7: P2, LT3, p2, work in pat as established to last 7 sts, p2, RT3, p2.
Row 8: K3, p2, k2, work in pat as established to last 7 sts, k2 p2, k3.
Right Front: Next Row (RS): Using 1 dpn, p3, k2, p2, work Row 1 of Cable Pat 2 over 4 sts, leave remaining 43 sts on dpn’s unworked for back and left front – 11 sts.
Following Row: Work Row 2 of Cable Pat 2 over 4 sts, k2, p2, k3. Work even in pat as established for 2 more rows, end on WS.
Shape Neck: Next Row (RS): Bind off 2 sts, k2, p2, work Row 1 of Cable Pat 2 over 4 sts – 9 sts.
Following Row: Work Row 2 of Cable Pat 2 over 4 sts, p2, k2, p1. Work even in pat as established until piece measures 2½” above sts on circular needle, end on WS. Bind off for shoulder.
Back: With RS facing, join yarn in first st on circular needle; using 1 dpn, bind off 4 sts, work Row 1 of Cable Pat 1 over 4 sts, p16, work Row 1 of Cable Pat 2 over 4 sts, turn, leaving remaining 15 sts on circular needle for left front – 24 sts.
Next Row (WS): Work Row 2 of Cable Pat 2 over 4 sts, k16, work Row 2 of Cable Pat 1 over 4 sts. Work even in pat as established until piece measures 2½” above sts on circular needle, end on WS. Bind off.
Left Front: With RS facing, join yarn in first st on circular needle; using 1 dpn, bind off 4 sts, work Row 1 of Cable Pat 1 over 4 sts, p3, k2, p2. Complete to correspond to right front, binding off sts for neck on WS row instead of RS row.
Finishing
Sew shoulder seams.
Buttonloop: With RS facing, using crochet hook, join yarn with a sl st at marker on left front edge. Ch 6, join with a sl st ½” above beg if ch. Fasten off. Sew button to right front edge opposite buttonloop.
Materials
1 Ball BLACKSTONE TWEED (50 grs), #2601 Clover Honey
1 Set (4) double pointed knitting needles, size 7 (4.50 mm) OR SIZE TO OBTAIN GAUGE
Cable needle (cn)
Crochet hook, size 4.50 mm (G)
1 St marker
One ½” button
- Yarns Used:Blackstone Tweed®
- Designer:Berroco Design Team
- Skill Level:Intermediate
- Craft:Knit
- Project Type:Toys